Şırnak Dam Final Design Project

Employer: DSI GENERAL DIRECTORATE/ DEPARTMENT OF DAMS AND HEPPs

Location: ŞIRNAK, Uludere

Project Information:

• For the aims of Safety and Energy,

• Annual 17.79 GWh energy generation install capacity of 2.50 MW in 2 unit

Services:

• Preparation of Preliminary Reports, Interim Reports and Project Reports,

• Preparation of the Reports of Engineering Geology and Natural Construction Materials in line with the field surveys carried out,

• Preparation of Design Criteria Reports which serve as a basis for the analyses,

• Preparation of Seismic Risk Analyses and Reports,

• Preparation Stability, Thermal, Seepage and Dynamic Analyses of the Embankment,

• Preparation of Final Projects for All Structures, Quantity-Survey and Technical Specifications required for the Construction Bid File.