ESPM reviewed previous topographical, geological and hydrological data. After the completion of the hydrological report, project formulation was changed, as recommended by ESPM. New project formulation was adapted. Final and detail design of structures and roads have been studied and applied.
The diversion component included a regulator, derivation tunnel and transmission line.
Services Provided include:
• Narrating Hydrological Report.
• Preparation of Geological Report based on Client’s geological investigations.
• 1/1000 Detailed cartography.
• Optimization of Project formulation.
• Detail design of Project Structures, roads and expropriation plans
• Preparation of tender documents leading to construction.